PMLedger

Commercial kitchen equipment maintenance agreement

Shop plan: $49/mo or $390/yr, no contract

Loaded example: a hotel kitchen with 2 door-type dishwashers, a conveyor dish machine, 2 combi ovens and an ice machine.

Equipment on the agreement

Unit typeQtyVisits/yrMin/unitCovered parts/visitRemove

Minutes and visits per unit type are our starting values to get you going. Replace them with yours: your agreement sets the service interval, not this calculator.

Costs and price

$/h

Wages, payroll taxes, workers’ comp, truck and tools spread over productive hours.

$
min

Blank: the highest visit count among the units. One visit services everything due that day.

$
%
%

PMLedger

Agreement profitability

Commercial kitchen equipment · sample 12-month agreement

Profitable: above target margin

Net annual price$2,900.00
Annual cost to service$1,636.67
Profit$1,263.33
Real margin43.56 %
Revenue per tech hour$140.32
Minimum renewal price at 30 %$2,338.10
Break-even price (0 % margin)$1,636.67
Current price per unit per month$40.28
Minimum price per unit per month$32.47
Tech hours per year20.66
Site visits4
Unit services16

Where the cost comes from

On-site labor$990.0060.5 %
Drive time$146.679.0 %
Trip charges$140.008.6 %
Covered parts$360.0022.0 %

Where margin leaks

  • Drive time and trip charges eat 17.6 % of the cost.
  • Every 10 extra minutes per unit costs you $146.67 a year.
Open shop workspace

Where margin leaks in this trade

  • Waiting for the line to stop: show up at 12:30 and the conveyor is running, so the PM starts at 4 pm. You pay for those hours.
  • Scale: in hard-water areas deliming the booster heater and elements doubles the planned minutes.
  • Dispenser tubing and door seals replaced every visit and missing from the covered parts list.
  • Combi oven probes and solenoids not on the truck: the second trip for a part eats that visit's margin.

Template checkpoints: Commercial dishwasher

Foodservice equipment · Quarterly · 60 min

  1. Delime tank, booster heater and elements if scaled
  2. Inspect wash and rinse arms, nozzles and bearings
  3. Verify wash and final rinse temperatures with a thermometer
  4. Check detergent and rinse aid dispensers and tubing
  5. Check water softener or treatment system
  6. Inspect wash pump, drain pump and tank strainers
  7. Check door or hood switch, seals and leaks

Typical PM consumables & parts

Deliming solution · Dispenser tubing · Seals · Softener salt

Suggested trade checkpoints only. Your service agreement sets the interval and scope, not this template.

FAQ

Does a PM agreement for a hotel kitchen pay?

With the loaded example, 6 units and 4 site visits a year cost $1,636.67 at a $55.00 loaded rate. At $2,900.00 net the real margin is 43.56 % and revenue per tech hour is $140.32. The floor for a 30 % margin is $2,338.10.

Why does the conveyor get 4 visits and the door-type 2?

It runs three shifts and builds more scale and curtain and arm wear. It is a starting value you settle with the customer.

How do I stop paying for time waiting on the kitchen?

Set the visit window in the agreement and add the wait to the minutes when it is not honored. Thirty extra minutes per unit show up at once in the "Every 10 extra minutes" line.