With the loaded example, 6 units and 4 site visits a year cost $1,636.67 at a $55.00 loaded rate. At $2,900.00 net the real margin is 43.56 % and revenue per tech hour is $140.32. The floor for a 30 % margin is $2,338.10.
Why does the conveyor get 4 visits and the door-type 2?
It runs three shifts and builds more scale and curtain and arm wear. It is a starting value you settle with the customer.
How do I stop paying for time waiting on the kitchen?
Set the visit window in the agreement and add the wait to the minutes when it is not honored. Thirty extra minutes per unit show up at once in the "Every 10 extra minutes" line.