PMLedger

High-speed door and dock leveler maintenance agreement

Shop plan: $49/mo or $390/yr, no contract

Loaded example: a distribution center with 6 high-speed doors on quarterly PM, 8 sectional dock doors, 8 hydraulic levelers and 8 dock seals.

Equipment on the agreement

Unit typeQtyVisits/yrMin/unitCovered parts/visitRemove

Minutes and visits per unit type are our starting values to get you going. Replace them with yours: your agreement sets the service interval, not this calculator.

Costs and price

$/h

Wages, payroll taxes, workers’ comp, truck and tools spread over productive hours.

$
min

Blank: the highest visit count among the units. One visit services everything due that day.

$
%
%

PMLedger

Agreement profitability

Commercial doors and dock levelers · sample 12-month agreement

Profitable: above target margin

Net annual price$5,200.00
Annual cost to service$3,139.33
Profit$2,060.67
Real margin39.63 %
Revenue per tech hour$120.00
Minimum renewal price at 30 %$4,484.77
Break-even price (0 % margin)$3,139.33
Current price per unit per month$14.44
Minimum price per unit per month$12.46
Tech hours per year43.33
Site visits4
Unit services64

Where the cost comes from

On-site labor$2,236.6771.2 %
Drive time$146.674.7 %
Trip charges$140.004.5 %
Covered parts$616.0019.6 %

Where margin leaks

  • Drive time and trip charges eat 9.2 % of the cost.
  • Every 10 extra minutes per unit costs you $586.67 a year.
Open shop workspace

Where margin leaks in this trade

  • Forklift hits: torn curtains and bent guides show up every visit and, unless the agreement says otherwise, get fixed as if they were wear.
  • Busy docks: with trailers loading the leveler cannot be serviced, so the tech waits or comes back another day.
  • Photo eyes and reversing edges failing between visits: the door-down emergency call gets run at no charge.
  • Leveler hoses and hydraulic oil: topping up is cheap, the hose is not, and neither is on the covered parts list.

Template checkpoints: High-speed door or dock leveler

Industrial · Quarterly · 45 min

  1. Check limit switches and opening and closing speed
  2. Test photo eyes, safety light curtain and reversing edge
  3. Inspect curtain or panel, guides and seals
  4. Inspect motor, brake and encoder
  5. Grease the points listed by the maker on leveler and lip
  6. Inspect leveler hydraulic unit: oil level, leaks and hoses
  7. Inspect dock seal or shelter and bumpers

Typical PM consumables & parts

Grease · Hydraulic oil (if topped up) · Rubber bumpers

Suggested trade checkpoints only. Your service agreement sets the interval and scope, not this template.

FAQ

What should a warehouse pay for door and dock maintenance?

With the loaded example, 30 units and 64 unit services a year at a $55.00 loaded rate cost $3,139.33. At $5,200.00 net that leaves $2,060.67, a real margin of 39.63 %. For 30 % the price should not go below $4,484.77.

Are forklift hits part of the agreement?

Best kept out and billed separately. In the calculator, only covered parts per visit count as cost; impact repairs do not touch the margin if you bill them.

Why do high-speed doors get 4 visits and sectionals 2?

They cycle hundreds of times a day and wear curtain, guides and motor faster. It is a starting value: you settle the interval with the customer.