What should a condo building pay for booster pump maintenance?
With the loaded example, 2 site visits a year at a $55.00 loaded rate cost $575.33. Drive time and trip charges are 24.9 % of that. At $760.00 net the real margin is 24.30 %; for 30 % the price should not go below $821.91.
Why does such a small agreement leave so little margin?
Because the drive is the same for one booster as for ten. If you have several buildings on the same block, split the trip and run it again: the margin moves a lot.
What gets tested every visit?
Cut-in and cut-out pressure, tank precharge, lead-lag alternation and dry-run protection. With those readings on the service report, any pressure complaint has an answer.