PMLedger

Commercial HVAC maintenance agreement

Shop plan: $49/mo or $390/yr, no contract

Loaded example: a retail site with 4 rooftop units on quarterly PM, 6 ceiling cassettes and 8 mini-split heads twice a year. Swap units, minutes and price for your own.

Equipment on the agreement

Unit typeQtyVisits/yrMin/unitCovered parts/visitRemove

Minutes and visits per unit type are our starting values to get you going. Replace them with yours: your agreement sets the service interval, not this calculator.

Costs and price

$/h

Wages, payroll taxes, workers’ comp, truck and tools spread over productive hours.

$
min

Blank: the highest visit count among the units. One visit services everything due that day.

$
%
%

PMLedger

Agreement profitability

Commercial HVAC · sample 12-month agreement

Profitable: above target margin

Net annual price$6,200.00
Annual cost to service$3,654.67
Profit$2,545.33
Real margin41.05 %
Revenue per tech hour$122.37
Minimum renewal price at 30 %$5,220.96
Break-even price (0 % margin)$3,654.67
Current price per unit per month$28.70
Minimum price per unit per month$24.17
Tech hours per year50.66
Site visits4
Unit services44

Where the cost comes from

On-site labor$2,640.0072.2 %
Drive time$146.674.0 %
Trip charges$140.003.8 %
Covered parts$728.0019.9 %

Where margin leaks

  • Drive time and trip charges eat 7.8 % of the cost.
  • Every 10 extra minutes per unit costs you $403.33 a year.
Open shop workspace

Where margin leaks in this trade

  • Roof access: hatch key, ladder or lift nobody scheduled. Thirty minutes of standing around per visit that never made it into the quote.
  • Odd-size RTU filters not stocked on the truck: the PM gets closed half done and someone rolls back another day.
  • Belts and blower bearings swapped "while we are up there" and logged as covered when the agreement does not include them.
  • Plugged condensate pans on cassettes: the leak call lands between two PM visits and gets handled at no charge.

Template checkpoints: Rooftop unit (RTU)

HVAC · Quarterly · 90 min

  1. Replace filters and note the condition they were in
  2. Check belt tension and wear; align pulleys
  3. Grease blower bearings if not sealed
  4. Clean evaporator and condenser coils
  5. Check economizer damper and actuator operation
  6. Measure pressures, superheat and subcooling
  7. Measure compressor and motor amp draw
  8. Inspect drain and trap, panel gaskets and curb

Typical PM consumables & parts

Filters · Belts · Bearing grease · Coil cleaner

Suggested trade checkpoints only. Your service agreement sets the interval and scope, not this template.

FAQ

What does it cost to deliver an HVAC agreement with 18 units?

With the loaded example (4 RTUs serviced 4 times a year, 6 cassettes and 8 mini-splits twice, at a $55.00 loaded labor rate) the agreement costs $3,654.67 a year to deliver over 50.66 tech hours. At a net price of $6,200.00 the real margin is 41.05 %. To hold a 30 % margin the floor is $5,220.96.

Why do the RTUs get more visits than the mini-splits?

They run more hours and load filters faster. It is a starting value: you and the customer set the interval. Change the visits column and the cost updates on the spot.

How much of the cost is just getting on the roof?

In the example, drive time and trip charges are 7.8 % of the annual cost. If you also wait for roof access, add it to the RTU minutes so the price covers it.