Loaded example: a retail site with 4 rooftop units on quarterly PM, 6 ceiling cassettes and 8 mini-split heads twice a year. Swap units, minutes and price for your own.
PMLedger
Agreement profitability
Commercial HVAC · sample 12-month agreement
Profitable: above target margin
Net annual price
$6,200.00
Annual cost to service
$3,654.67
Profit
$2,545.33
Real margin
41.05 %
Revenue per tech hour
$122.37
Minimum renewal price at 30 %
$5,220.96
Break-even price (0 % margin)
$3,654.67
Current price per unit per month
$28.70
Minimum price per unit per month
$24.17
Tech hours per year
50.66
Site visits
4
Unit services
44
Where the cost comes from
On-site labor
$2,640.00
72.2 %
Drive time
$146.67
4.0 %
Trip charges
$140.00
3.8 %
Covered parts
$728.00
19.9 %
Where margin leaks
Drive time and trip charges eat 7.8 % of the cost.
Every 10 extra minutes per unit costs you $403.33 a year.
What does it cost to deliver an HVAC agreement with 18 units?
With the loaded example (4 RTUs serviced 4 times a year, 6 cassettes and 8 mini-splits twice, at a $55.00 loaded labor rate) the agreement costs $3,654.67 a year to deliver over 50.66 tech hours. At a net price of $6,200.00 the real margin is 41.05 %. To hold a 30 % margin the floor is $5,220.96.
Why do the RTUs get more visits than the mini-splits?
They run more hours and load filters faster. It is a starting value: you and the customer set the interval. Change the visits column and the cost updates on the spot.
How much of the cost is just getting on the roof?
In the example, drive time and trip charges are 7.8 % of the annual cost. If you also wait for roof access, add it to the RTU minutes so the price covers it.