PMLedger

Technician capacity, route density and SLA coverage

Shop plan: $49/mo or $390/yr, no contract

Enter your agreement book and your crew. The math runs in your browser with exact arithmetic and tells you whether your techs can hold the SLA or are overbooked.

Preventive workload

min
min
%

Reactive and urgent calls on top of the PM workload. 20–40 % is typical in HVAC and refrigeration.

Crew and schedule

h
%

Training, parts runs, paperwork, waiting time and PTO if not already removed.

Cost and margin

$

Wages, payroll taxes, benefits, truck and tools.

%

PMLedger

Capacity study

Preventive agreement book · 12-month period

SLA at risk: utilization above 85 %

PM unit visits per year3,840
Site visits per year480
On-site hours2,880.00
Drive hours400.00
Emergency and callback buffer (h)984.00
Total workload per year (h)4,264.00
Drive time share of PM workload12.2 %
Net billable hours per tech per year1,632.00
Full-time technicians needed2.61
Minimum technicians (rounded up)3
Technicians to stay under 85 %4
Current crew utilization87.1 %
Spare crew hours (negative = short)632.00
Max agreements per tech at 85 %39
Max units per tech at 85 %312
Annual crew cost$255,000.00
Cost per billable hour$52.08
Minimum annual revenue at 30 %$364,285.72
Minimum average price per agreement$3,035.72
Minimum rate per workload hour$85.44
Open shop workspace

How it is calculated

  • Unit visits = agreements × units per agreement × visits per year; on-site hours = unit visits × minutes ÷ 60.
  • Drive hours = agreements × site visits per year × drive minutes ÷ 60.
  • Total workload = (on-site + drive) × (1 + emergency buffer).
  • Net hours per tech = workdays × shift hours × (1 − non-billable time).
  • Full-time techs = total workload ÷ net hours; utilization = workload ÷ (techs × net hours). Above 85 % there is no slack left for emergency calls.
  • Minimum revenue = crew cost ÷ (1 − target margin), rounded up to the cent.

Frequently asked questions

How many technicians do I need for my maintenance agreements?

With 120 agreements of 8 units, 4 PM visits per year of 45 minutes, 4 site visits per agreement with 50 drive minutes and a 30 % emergency buffer, the workload is 4,264 hours a year. Each tech delivers 1,632 net hours: you need 2.61 full-time techs (3). That is the example loaded above.

Why the 85 % threshold?

Because breakdowns do not schedule themselves. With the crew above 85 % utilization any emergency call pushes PM visits back and response times in the agreement start slipping.

What goes into the loaded annual cost per tech?

Everything it costs to keep the tech in the field: wages, payroll taxes, benefits, truck, fuel, tools and phone.

Is my data stored?

No. The math runs in your browser. Only if you click “Save and send to workspace” is a copy kept in this browser so you can move it to your workspace.